Project Listings
In the 42-year history of Cates Sheet Metal Industries, a wide variety of projects have been performed. Below is a snapshot of projects completed within the last several years, from arenas and hospitals to jails and restaurants, showing a range of capability from large to small.
Arena / Convention Center / Museum
| PROJECT NAME |
Kauffman Center for the Performing Arts |
| CONTRACT AMOUNT |
$11,000,000 |
| ARCHITECT |
Moshe Safdie |
| ENGINEER |
W.L Cassell |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
US Engineering |
| BUILDING TYPE |
New Construction |
| SUMMARY |
285,000 square feet between the two main performance halls. |
| PROJECT NAME |
Arts District Parking Garage |
| CONTRACT AMOUNT |
$400,000 |
| START/END DATE |
2011-2011 |
| OWNER |
Kauffman Center for the Performing Arts |
| ARCHITECT |
Moshe Safdie |
| ENGINEER |
W.L. Cassell |
| GENERAL CONTRACTOR |
Walton |
| MECHANICAL CONTRACTOR |
US Engineering |
| BUILDING TYPE |
New comstruction |
| SUMMARY |
Parking garage for Kauffman Center for the Performing Arts. |
| PROJECT NAME |
Kauffman Stadium Renovations |
| CONTRACT AMOUNT |
$5,475,000 |
| START/END DATE |
2008 - 2009 |
| OWNER |
The Kansas City Royals |
| ARCHITECT |
Populous |
| ENGINEER |
M.E. Engineers |
| GENERAL CONTRACTOR |
Hunt / Walton Construction |
| MECHANICAL CONTRACTOR |
Foley Company |
| BUILDING TYPE |
Renovation / Remodel / New Construction |
| SUMMARY |
Demolition and renovation of the existing building. This project also included new construction in the outfield area. These buildings include, but are not limited to, the Rivals Restaurant & Bar and the Hall Of Fame Building.
|
| PROJECT NAME |
Sprint Center for Downtown Kansas City |
| CONTRACT AMOUNT |
$5,500,000 |
| START/END DATE |
2005 - 2007 |
| OWNER |
Kansas City Missouri / AEG |
| ARCHITECT |
360 Architecture, Ellerbe Becket and HOK Sport |
| ENGINEER |
M.E. Engineers, Inc. |
| GENERAL CONTRACTOR |
M.A. Mortenson |
| MECHANICAL CONTRACTOR |
Foley Company |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| Size -- |
Arena 617,000 sf, NABC 40,000 sf |
| Seating -- |
Hockey |
Basketball |
End Stage |
Center Stage |
| |
17104 |
18449 |
14444 |
18954 |
| 72 private suites (16 to 22 seat capacity) |
|
| PROJECT NAME |
Qwest Center and Omaha Convention Center |
| CONTRACT AMOUNT |
$6,200,000 |
| START/END DATE |
2001 - 2003 |
| OWNER |
Metropolitan Entertainment and Convention Authority (MECA) |
| ARCHITECT |
DLR Group |
| ENGINEER |
M.E. Engineers |
| GENERAL CONTRACTOR |
Keiwit Construction Company |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| 481,000 sf convention center and 471,000 sf arena up to 17,000 seats. |
|
| PROJECT NAME |
Nelson Atkins - Bloch Building |
| CONTRACT AMOUNT |
$1,300,000 |
| START/END DATE |
2003 - 2006 |
| OWNER |
The Nelson Gallery Foundation |
| ARCHITECT |
Steven Holl Architects / BNIM |
| ENGINEER |
W.L. Cassell |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New construciton |
| SUMMARY |
|
| PROJECT NAME |
Overland Park Community Center |
| CONTRACT AMOUNT |
$395,000 |
| START/END DATE |
2006 - 2008 |
| OWNER |
City of Overland Park |
| ARCHITECT |
Gould Evans Architects |
| ENGINEER |
Henderson Engineers Inc. |
| GENERAL CONTRACTOR |
McCown Gordon Construction |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
| PROJECT NAME |
Overland Park Convention Center |
| START/END DATE |
2001 - 2002 |
| OWNER |
City Of Overland Park, KS |
| ARCHITECT |
DLR Group |
| ENGINEER |
Smith & Boucher |
| GENERAL CONTRACTOR |
Turner Construction Co. |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| 234,000 sq. ft., $60 million convention center. The state-of-the-art facility consists of a 60,000 sq. ft. exhibition hall, 25,000 sq. ft. banquet hall, 15,000 sq. ft. of meeting space and support areas including a commercial kitchen. |
|
| PROJECT NAME |
Crystal Bridges Museum of American Art |
| CONTRACT AMOUNT |
$3,000,000 |
| OWNER |
|
| ARCHITECT |
Safdie Architects |
| GENERAL CONTRACTOR |
Linbeck |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contrators |
| BUILDING TYPE |
New Construction |
| SUMMARY |
201,000-sq-ft art museum set in a blasted-out ravine in northwest Arkansas. |
| PROJECT NAME |
Arrowhead Stadium Renovations |
| CONTRACT AMOUNT |
$5,425,000 |
| START/END DATE |
2008 - 2010 |
| OWNER |
The Kansas Chiefs |
| ARCHITECT |
Populous |
| ENGINEER |
M.E. Engineers |
| GENERAL CONTRACTOR |
Turner Construction |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
Renovation / Remodel / New Construction |
| SUMMARY |
Demolition and renovation of the existing building. This project also included new construction in new Press and Horizon Levels of the stadium. |
|
Hospital / Health Care / Medical Research
|
| PROJECT NAME |
St. Luke's Lee's Summit Expansion of Building F |
| CONTRACT AMOUNT |
$205,000 |
| OWNER |
St. Luke's Hospital |
| ENGINEER |
W.L. Cassell and Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction |
| SUMMARY |
Addition of a 5th floor. |
| PROJECT NAME |
St. Luke's College of Health Sciences |
| CONTRACT AMOUNT |
$150,000 |
| OWNER |
St. Luke's Hospital |
| ENGINEER |
W.L. Cassell and Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
Renovation/Remodel |
| SUMMARY |
St. Luke's College of Health Sciences relocation to Kansas City, MO |
| PROJECT NAME |
Children's Mercy Hospital Elizabeth Ann Hall Patient Tower |
| CONTRACT AMOUNT |
$1,400,000 |
| OWNER |
Children's Mercy Hospital |
| ENGINEER |
Smith, Seckman and Reid, Inc |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction |
| SUMMARY |
Six story tower with the addition of 73 new beds. |
| PROJECT NAME |
Children's Mercy Clinics on Broadway |
| CONTRACT AMOUNT |
$640,000 |
| OWNER |
Children's Mercy Hospital |
| ENGINEER |
Smith, Seckman and Reid, Inc |
| GENERAL CONTRACTOR |
McCrow Gordon Construction |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
| SUMMARY |
Pediatric care clinic and |
| PROJECT NAME |
Children's Mercy Hospital ED, OR and Cath Lab expansion |
| CONTRACT AMOUNT |
$915,000 |
| OWNER |
Children's Mercy Hospital |
| ENGINEER |
Smith, Seckman and Reid, Inc |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction |
| SUMMARY |
Expansion of Emergency Department, Operating Room and Catheterization Laboratory. |
| PROJECT NAME |
Stowers Institute for Medical Research-Bldg.1 |
| CONTRACT AMOUNT |
$4,800,000 |
| ARCHITECT |
PGVA Architects |
| ENGINEER |
Gayner Engineers |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
| SUMMARY |
Institute for medical research. |
| PROJECT NAME |
Centerpoint Medical Center |
| CONTRACT AMOUNT |
$4,950,00 |
| OWNER |
HCA |
| ENGINEER |
I.C. Thomasson Associates Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
| SUMMARY |
Hospital and Medical building |
| PROJECT NAME |
Irwin Army Community Hospital |
| CONTRACT AMOUNT |
$8,000,000 |
| OWNER |
Corp of Engineers |
| ENGINEER |
Corp of Engineers |
| GENERAL CONTRACTOR |
Balfour Beatty |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors / P1 Group |
| BUILDING TYPE |
New Construction |
| SUMMARY |
The total square footage of the new facility will increase by about 170,000 square feet. There will be 20 medical/surgical bays, 16 labor and delivery rooms as opposed to the current eight and eight inpatient psychiatric beds. |
| PROJECT NAME |
Western Missouri Medical Center |
| CONTRACT AMOUNT |
$1,990,000 |
| ARCHITECT |
HMN Architects |
| ENGINEER |
Brack and Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction |
| SUMMARY |
Medical Center |
| PROJECT NAME |
KU Medical Vertical Expansion |
| CONTRACT AMOUNT |
$1,520,000 |
| OWNER |
KU Medical Center |
| ENGINEER |
Smith, Seckman and Reid, Inc |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
Foley Company |
| BUILDING TYPE |
New Construction / Expansion |
| SUMMARY |
24,500-square-foot addition |
| PROJECT NAME |
KU Medical Surgery Remodel |
| CONTRACT AMOUNT |
$5,350,000 |
| OWNER |
KU Medical Center |
| ENGINEER |
W.L. Cassell |
| GENERAL CONTRACTOR |
McCrown Gordon |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
Renovation / Remodel |
| SUMMARY |
Remodel |
| PROJECT NAME |
Bothwell Regional Health Center East Addition |
| CONTRACT AMOUNT |
$336,000 |
| OWNER |
Bothwell Regional Health Center |
| ENGINEER |
Brack and Associates |
| GENERAL CONTRACTOR |
Excel Constructors |
| MECHANICAL CONTRACTOR |
Foley Company |
| BUILDING TYPE |
New Construction / Expansion |
| SUMMARY |
5,000-square-foot addition is a two-story brick structure that houses Bothwell’s cancer and cardiovascular treatment programs.
|
| PROJECT NAME |
Shawnee Mission Medical Center - Surgery Center |
| CONTRACT AMOUNT |
$220,000 |
| OWNER |
Shawnee Mission Medical Center |
| ENGINEER |
Smith, Seckman and Reid, Inc |
| GENERAL CONTRACTOR |
Excel Constructors |
| MECHANICAL CONTRACTOR |
Rand |
| BUILDING TYPE |
Tenant Finish |
| SUMMARY |
Two-story tenant finish of the existing Medical Office Building in front of Shawnee Mission Medical Center.
|
| PROJECT NAME |
Olathe Medical Center - Energy Center |
| CONTRACT AMOUNT |
$70,000 |
| OWNER |
Shawnee Medical Center |
| ENGINEER |
W.L. Cassell |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
Renovation of existing building. |
| SUMMARY |
Complete renovation and addition of a new Energy Center on the main campus of Olathe Medical Center. |
| PROJECT NAME |
Olathe Medical Center Critical Care Unit |
| CONTRACT AMOUNT |
$275,000 |
| OWNER |
Olathe Medical Center |
| ENGINEER |
W.L. Cassell |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New construction |
| SUMMARY |
Vertical expansion at the Olathe Medical Center Campus which includes the relocation of the Critical Care Unit. |
| PROJECT NAME |
Altus Air Force Base - Altus, Oklahoma |
| CONTRACT AMOUNT |
$290,000 |
| OWNER |
US Army Corps of Engineers |
| ENGINEER |
W.L. Cassell |
| GENERAL CONTRACTOR |
United Excel |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
Renovation |
| SUMMARY |
Demolition and renovation of the existing Medical Office
Building on the Altus Air Force Base. Construction include the addition of a new Dental Clinic.
|
|
| PROJECT NAME |
Cameron Medical Center |
| CONTRACT AMOUNT |
$400,000 |
| START/END DATE |
2001 - 2002 |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| The new $11 million hospital is a 60,800 square foot, one-story, 58-bed facility with technologically-advanced equipment and new furnishings. Cameron Regional has 33 medical/surgical beds, six inpatient rehabilitation beds, five ICU cubicles, six ER treatment bays, and ten GeroPsychiatric beds. |
|
|
|
| PROJECT NAME |
Truman Medical Center - Lakewood ER Expansion |
| CONTRACT AMOUNT |
$1,200,000 |
| START/END DATE |
2005 - 2006 |
| OWNER |
Truman Medical Center |
| ARCHITECT |
ACI Boland |
| ENGINEER |
Bredson Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| Addition of a three story wing for Emergency Rooms, Isolation Rooms, and other medical areas. |
|
|
|
| PROJECT NAME |
Lee's Summit Hospital |
| CONTRACT AMOUNT |
$1,800,000 |
| START/END DATE |
2006 - 2007 |
| OWNER |
HCA |
| ARCHITECT |
Perkins+Will |
| ENGINEER |
CCRD Partners Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
Research Hospital |
| CONTRACT AMOUNT |
$309,500 |
| START/END DATE |
2005 - 2007 |
| OWNER |
HCA |
| ENGINEER |
PSP |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
Remodel |
| SUMMARY |
|
|
|
| PROJECT NAME |
St. Luke's Wornall Campus - MAHI Tower / Women's Center |
| CONTRACT AMOUNT |
$6,000,000 |
| START/END DATE |
2008 (forthcoming) |
| ARCHITECT |
ACI Boland |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
St. Luke's Lee's Summit - Hospital Expansion (Bldg."A") |
| CONTRACT AMOUNT |
$1,600,000 |
| START/END DATE |
2008 - |
| ARCHITECT |
ACI Boland |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
St. Luke's Lee's Summit - Cardiovascular Consultants (Bldg."C") |
| CONTRACT AMOUNT |
$170,000 |
| START/END DATE |
2008 - |
| ARCHITECT |
ACI Boland |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
St. Luke's Lee's Summit - O.R. Expansion (Bldg."A") |
| CONTRACT AMOUNT |
$220,000 |
| START/END DATE |
2008 - |
| ARCHITECT |
ACI Boland |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
St. Luke's Lee's Summit - E. R. Addition (Bldg."B") |
| CONTRACT AMOUNT |
$40,000 |
| START/END DATE |
2008 - |
| ARCHITECT |
ACI Boland |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
St. Luke's South - 3rd Floor Expansion |
| CONTRACT AMOUNT |
$231,000 |
| START/END DATE |
2007 - 2008 |
| ARCHITECT |
ACI Boland |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
Bothwell Regional Medical Center Kitchen Expansion (Sedalia, MO) |
| CONTRACT AMOUNT |
$306,000 |
| START/END DATE |
2007 - 2008 |
| OWNER |
Bothwell RMC |
| ARCHITECT |
ACI Boland |
| ENGINEER |
Brack & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
Rand Construction Co. |
| BUILDING TYPE |
Remodel |
|
|
| PROJECT NAME |
Ellett Hospital (Appleton City, MO) |
| CONTRACT AMOUNT |
$306,000 |
| START/END DATE |
2007 - 2008 |
| ARCHITECT |
ACI Boland |
| ENGINEER |
Bredson & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
Foley Company |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
McCune Brooks Hospital (Carthage, MO) |
| CONTRACT AMOUNT |
$1,605,000 |
| START/END DATE |
2006 - 2008 |
| OWNER |
McCune Brooks Hospital |
| ARCHITECT |
HMN Architects |
| ENGINEER |
Brack & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
Foley Company |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
UMKC Health Services Bldg. |
| CONTRACT AMOUNT |
$1,610,000 |
| START/END DATE |
2005 - 2007 |
| OWNER |
The Curators of the University of Missouri |
| ARCHITECT |
Kallman, McKinell and Wood Architects |
| ENGINEER |
I.D.E.A. |
| GENERAL CONTRACTOR |
Walton Construction |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors, Inc. |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
KU Medical Center Heart Hospital |
| CONTRACT AMOUNT |
$2,310,000 |
| START/END DATE |
2006 - 2007 |
| OWNER |
University of Kansas Hospitals |
| ARCHITECT |
RTKL Associates |
| ENGINEER |
Smith, Seckman and Reid, Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
KU Westwood |
| CONTRACT AMOUNT |
$1,200,000 |
| START/END DATE |
2006 - 2007 |
| OWNER |
KU MED |
| ARCHITECT |
RTKL |
| ENGINEER |
Meinhardt Consulting Engineers |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
Remodel |
|
|
| PROJECT NAME |
Liberty Hospital - Medical Plaza East |
| CONTRACT AMOUNT |
$640,000 |
| START/END DATE |
2004 - 2005 |
| ARCHITECT |
Hoefer, Wysocki Architects |
| ENGINEER |
Henderson Engineers Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
JRH Biosciences |
| CONTRACT AMOUNT |
$492,100 |
| START/END DATE |
2004 - 2005 |
| GENERAL CONTRACTOR |
McCown Gordon Construction |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
North Kansas City Hospital - Health Services Pavilion |
| CONTRACT AMOUNT |
$2,150,000 |
| START/END DATE |
2003 - 2005 |
| ARCHITECT |
HMN Architects |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
St. Luke's Lee's Summit |
| CONTRACT AMOUNT |
$2,150,000 |
| START/END DATE |
2003 - 2005 |
| ARCHITECT |
HMN Architects |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
Children's Mercy Hospital - Clinic & Research Bldg. |
| CONTRACT AMOUNT |
$1,405,000 |
| START/END DATE |
2002 - 2004 |
| ARCHITECT |
HMN Architects |
| ENGINEER |
Smith, Seckman and Reid, Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
Children's Mercy Hospital - Henson Tower |
| CONTRACT AMOUNT |
$630,000 |
| START/END DATE |
2001 - 2003 |
| ARCHITECT |
HMN Architects |
| ENGINEER |
Smith, Seckman and Reid, Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
Cathedral Square / KC Southern |
| CONTRACT AMOUNT |
$378,000 |
| START/END DATE |
2000 - 2002 |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
W.L. Carrell Children's Hospital |
| CONTRACT AMOUNT |
$6,500,000 |
| OWNER |
Vanderbilt University |
| ENGINEER |
SSR, Inc. |
| GENERAL CONTRACTOR |
Centex-Rodgers Construction Company |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
Hospital |
| SUMMARY |
|
|
|
| PROJECT NAME |
Baptist Health Memorial Medical Center North Little Rock, Arkansas |
| START/END DATE |
2000 - 2002 |
| GENERAL CONTRACTOR |
Baldwin Shell Construction Co. |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction
|
|
|
PROJECT NAME
|
Independence Regional Ennovation Center |
| CONTRACT AMOUNT |
$500,000 |
| OWNER |
Independence School District |
| ENGINEER |
Systek |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group Inc. |
| BUILDING TYPE |
Remodel |
| SUMMARY |
Wet lab and culinary remodel |
| PROJECT NAME |
St. Luke's Lee's Summit Neonatal ICU |
| CONTRACT AMOUNT |
$180,000 |
| OWNER |
St. Luke's Hospital |
| ENGINEER |
W.L. Cassell and Associates |
| GENERAL CONTRACTOR |
Turner |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
| SUMMARY |
Level 2 NICU. |
| PROJECT NAME |
Stowers Institute for Medical Research - Bldg. 3 |
| CONTRACT AMOUNT |
$9,200,000 |
| START/END DATE |
2002 - 2004 |
| ARCHITECT |
PGAV Architects |
| ENGINEER |
Gayner Engineers |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
| PROJECT NAME |
National Animal Health and Food Safety Institute - Olathe, KS |
| CONTRACT AMOUNT |
$1,205,000 |
| ARCHITECT |
360 Architecture |
| ENGINEER |
Henderson Engineers |
| GENERAL CONTRACTOR |
The Weitz Company |
| MECHANICAL CONTRACTOR |
US Engineering |
| BUILDING TYPE |
New construction |
| SUMMARY |
The International Animal Health and Food Safety Institute is a $28 million, 108,000-square-foot building that will house research, education and commercialization programs in its laboratories and classrooms.
|
Hotel / Casinos
|
| |
| PROJECT NAME |
Hilton Americas - Hotel & Convention Center - Houston, TX |
| CONTRACT AMOUNT |
$7,900,000 |
| OWNER |
Hilton Hotels |
| ENGINEER |
I.A. Namant Associates Inc. |
| GENERAL CONTRACTOR |
Turner Construction Co. |
| MECHANICAL CONTRACTOR |
MLN Mechanical Contractors |
| BUILDING TYPE |
Hotel and Convention Center |
| SUMMARY |
|
|
|
| PROJECT NAME |
Kirkwood Circle |
| CONTRACT AMOUNT |
$800,000 |
| START/END DATE |
2003 - 2005 |
| OWNER |
DST Realty, Inc |
| ARCHITECT |
Nagle Hartray Danker Kagan McKay Penney Architects Ltd. |
| ENGINEER |
ME Engineers |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| 69-unit luxury condominiums. The ground floor plan includes the lobby, fitness center, and building office plus 3 housing units and an outdoor lap pool/whirlpool for residents. Unit types and sizes vary, from 1,160 - 2,070 s.f. on the 2nd through 9th floors, culminating in 2, underground parking garage accommodates 176 cars. |
|
|
|
| PROJECT NAME |
Harrah's Pavilion Expansion |
| CONTRACT AMOUNT |
$1,400,000 |
| START/END DATE |
2005 - 2006 |
| OWNER |
Harrah's Entertainment Group |
| ARCHITECT |
Paul Steelman Design Group |
| ENGINEER |
GSA Consulting Engineers. |
| GENERAL CONTRACTOR |
Walton Construction |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
Remodel and renovation |
| SUMMARY |
| Addition of restaurants such as Toby Keith's I Love This Bar, Moby's Fish Tales, and The Range Stakehouse as well as the addition of a two story mulit-purpose lounge / night club. |
|
|
|
| PROJECT NAME |
Harrah's North Kansas City Hotel |
| CONTRACT AMOUNT |
$650,000 |
| START/END DATE |
2004 - 2005 |
| OWNER |
Harrah's Entertainment Group |
| ARCHITECT |
Paul Steelman Design Group |
| ENGINEER |
Giovanetti Shulman Associates |
| GENERAL CONTRACTOR |
Walton Construction |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
Kansas City Station Casino - Vessels 1 & 2 |
| START/END DATE |
1996 |
| OWNER |
Station Casinos |
| ARCHITECT |
Peckham, Guyton, Albers & Viets |
| ENGINEER |
AE Associates, Inc. |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
|
|
|
|
Commercial Buildings
|
| |
| PROJECT NAME |
H&R Block World Headquarters |
| CONTRACT AMOUNT |
$4,500,000 |
| START/END DATE |
2005 - 2006 |
| OWNER |
H&R Block |
| ARCHITECT |
CDFM2 |
| ENGINEER |
M.E. Engineers |
| GENERAL CONTRACTOR |
Hines / JE Dunn |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| The 585,000-square-foot office building will house up to 2,000 general office work spaces, a 10,000-square-foot data center, a 300-seat theater that will be jointly used by the Kansas City Repertory Theater, a full-service employee café, and a five-level, 2,000-space below-grade parking structure. |
|
|
|
| PROJECT NAME |
Union Pacific Headquarters Building |
| CONTRACT AMOUNT |
$4,500,000 |
| OWNER |
Union Pacific Railroad |
| ENGINEER |
Alvine and Associates Inc. |
| GENERAL CONTRACTOR |
Holder Construction Co. |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
Office Building |
| SUMMARY |
|
|
|
| PROJECT NAME |
2525 West End Avenue |
| CONTRACT AMOUNT |
$940,000 |
| OWNER |
Vanderbilt University |
| ARCHITECT |
Skidmore, Owings and Merrill LLP |
| ENGINEER |
SSR, Inc. |
| GENERAL CONTRACTOR |
Brasfield and Gorrie LLC |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
Office Building |
| SUMMARY |
|
|
|
| PROJECT NAME |
Midwest Mechanical Contractors - Kansas City |
| CONTRACT AMOUNT |
$83,000 |
| START/END DATE |
2006 |
| OWNER |
Midwest Mechanical Contractors |
| ARCHITECT |
Davidson Design Group |
| ENGINEER |
BC Engineers |
| GENERAL CONTRACTOR |
Meyer Brothers Building Company |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| The relocation of Midwest's Kansas City headquarters to Kansas City, MO. |
|
|
|
| PROJECT NAME |
Cabela's |
| CONTRACT AMOUNT |
$720,000 |
| START/END DATE |
2001 - 2002 |
| OWNER |
Cabela's |
| ARCHITECT |
KKE Architects |
| GENERAL CONTRACTOR |
Kraus Anderson |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
| SUMMARY |
|
|
|
| PROJECT NAME |
Applebee's Support Center |
| CONTRACT AMOUNT |
$1,155,000 |
| START/END DATE |
2007 - 2008 |
| OWNER |
Applebee's / IHOP |
| ARCHITECT |
Berkebile, Nelson, Immenschuh, McDowell Inc. |
| ENGINEER |
Lankford & Associates Consulting Engineers, Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
American Century Services 4400 |
| CONTRACT AMOUNT |
$174,000 |
| START/END DATE |
2006 - 2007 |
| OWNER |
American Century Services |
| ARCHITECT |
360 |
| ENGINEER |
Smith & Boucher |
| BUILDING TYPE |
Remodel |
| SUMMARY |
| Auditorium and Office Remodel |
|
|
|
| PROJECT NAME |
American Century Services / Summit Tech Campus |
| CONTRACT AMOUNT |
$341,500 |
| START/END DATE |
2006 - 2007 |
| OWNER |
American Century Services |
| ARCHITECT |
360 |
| ENGINEER |
Smith & Boucher |
| BUILDING TYPE |
Remodel |
| SUMMARY |
| Office and Computer Lab Remodel |
|
|
|
| PROJECT NAME |
Johnson County Communications Center |
| CONTRACT AMOUNT |
$286,000 |
| START/END DATE |
2008 - |
| OWNER |
Johnson County, Kansas |
| ARCHITECT |
PGAV Architects |
| ENGINEER |
CRB |
| GENERAL CONTRACTOR |
McCown Gordon Construction |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
Toyota - Georgetown, KY |
| START/END DATE |
1991 - 1992 |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
Valencia Place / Lockton Ins. Bldg. |
| CONTRACT AMOUNT |
$693,000 |
| START/END DATE |
1998 - 2000 |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
Correctional / Institutional / Law Enforcement / Government / Military
| PROJECT NAME |
Douglas County Prison |
| START/END DATE |
1997 - 1999 |
| OWNER |
Douglas County, KS Board of County Commissioners |
| ARCHITECT |
Michael Treanor Architects |
| ENGINEER |
W.L. Cassell & Associates |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| The 82,472-square foot jail is a 4-story structure designed to house 265 male and female inmates in minimum, medium and maximum security levels on the 23-acre site and should meet the counties needs for inmate housing through 2019. |
|
| PROJECT NAME |
Chillicothe Correctional Center |
| CONTRACT AMOUNT |
$4,800,000 |
| START/END DATE |
2007 - 2008 |
| ARCHITECT |
DLR Group |
| ENGINEER |
KAI Design & Build |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
US Engineering Co |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| The Correctional Center is 460,000 square feet in 14 building. This is all spread out over 145 acres of land. The $110 million project will house up to 1,636 inmates |
|
| PROJECT NAME |
Johnson County Waste Water Treatment Plant |
| CONTRACT AMOUNT |
$740,000 |
| OWNER |
Johnson County |
| ARCHITECT |
Black and Veatch |
| GENERAL CONTRACTOR |
Grimm Construction |
| MECHANICAL CONTRACTOR |
P1 Group Inc. |
| BUILDING TYPE |
New Construction |
| SUMMARY |
Water District NO.1 facility 3 phase 5. |
| PROJECT NAME |
Whiteman Air Force Base Explosive Ordnance Disposal Complex |
| CONTRACT AMOUNT |
$132,000 |
| OWNER |
Corp of Engineers |
| ARCHITECT |
Corp of Engineers |
| ENGINEER |
Corp of Engineers |
| MECHANICAL CONTRACTOR |
Foley Company |
| BUILDING TYPE |
New Construction |
| SUMMARY |
Explosive Ordnance Complex in Missouri. |
| PROJECT NAME |
Johnson County Crime Lab |
| CONTRACT AMOUNT |
$900,000 |
| START/END DATE |
2011-2012 |
| ARCHITECT |
PGVA Architects |
| ENGINEER |
Harley Ellis Devereaux |
| GENERAL CONTRACTOR |
Weitz Company |
| MECHANICAL CONTRACTOR |
US Engineering |
| BUILDING TYPE |
New Construction |
| SUMMARY |
Johnson County Sheriff's Department criminalistics laboratory. |
|
PROJECT NAME
|
United States Disciplinary Barracks |
| CONTRACT AMOUNT |
$2,200,000 |
| START/END DATE |
1998 - 2002 |
| ARCHITECT |
U.S. Army Corps of Engineers |
| ENGINEER |
U.S. Army Corps of Engineers |
| GENERAL CONTRACTOR |
Hensel Phelps |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
| SUMMARY |
Size: More than 260,000 square feet of living, office, and workspace Maximum overall housing capacity: 515 inmates
Cost: $67.8 million |
|
|
|