Arena / Convention Center / Museum
|
| |
| PROJECT NAME |
Kauffman Center for the Performing Arts |
| CONTRACT AMOUNT |
$10,000,000 |
| START/END DATE |
2008 - 2010 |
| OWNER |
Kauffman Center for the Performing Arts |
| ARCHITECT |
Moshe Safdie / BNIM |
| ENGINEER |
Arup USA Inc. / W.L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| 360,000 SF performing arts center will be home to the Kansas City Symphony, the Kansas City Ballet, the Lyric Opera, and other arts organizations. It will contain three performing spaces and a 2,200-seat ballet/opera house, a 1,800-seat concert hall, and a 500-seat flexible, experimental theater. |
|
|
|
| PROJECT NAME |
Sprint Center for Downtown Kansas City |
| CONTRACT AMOUNT |
$5,500,000 |
| START/END DATE |
2005 - 2007 |
| OWNER |
Kansas City Missiouri / AEG |
| ARCHITECT |
360 Architecture, Ellerbe Becket and HOK Sport |
| ENGINEER |
M.E. Engineers, Inc. |
| GENERAL CONTRACTOR |
M.A. Mortenson |
| MECHANICAL CONTRACTOR |
Foley Company |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| Size -- |
Arena 617,000 sf, NABC 40,000 sf |
| Seating -- |
Hockey |
Basketball |
End Stage |
Center Stage |
| |
17104 |
18449 |
14444 |
18954 |
| 72 private suites (16 to 22 seat capacity) |
|
|
|
| PROJECT NAME |
Qwest Center and Omaha Convention Center |
| CONTRACT AMOUNT |
$6,200,000 |
| START/END DATE |
2001 - 2003 |
| OWNER |
Metropolitan Entertainment and Convention Authority (MECA) |
| ARCHITECT |
DLR Group |
| ENGINEER |
M.E. Engineers |
| GENERAL CONTRACTOR |
Keiwit Construction Company |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| 481,000 sf convention center and 471,000 sf arena up to 17,000 seats. |
|
|
|
| PROJECT NAME |
Nelson Atkins - Bloch Building |
| CONTRACT AMOUNT |
$1,300,000 |
| START/END DATE |
2003 - 2006 |
| OWNER |
The Nelson Gallery Foundation |
| ARCHITECT |
Steven Holl Architects / BNIM |
| ENGINEER |
W.L. Cassell |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New construciton |
| SUMMARY |
|
|
|
| PROJECT NAME |
Overland Park Community Center |
| CONTRACT AMOUNT |
$395,000 |
| START/END DATE |
2006 - 2008 |
| OWNER |
City of Overland Park |
| ARCHITECT |
Gould Evans Architects |
| ENGINEER |
Henderson Engineers Inc. |
| GENERAL CONTRACTOR |
McCown Gordon Construction |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
| |
|
|
|
| PROJECT NAME |
Overland Park Convention Center |
| START/END DATE |
2001 - 2002 |
| OWNER |
City Of Overland Park, KS |
| ARCHITECT |
DLR Group |
| ENGINEER |
Smith & Boucher |
| GENERAL CONTRACTOR |
Turner Construction Co. |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| 234,000 sq. ft., $60 million convention center. The state-of-the-art facility consists of a 60,000 sq. ft. exhibition hall, 25,000 sq. ft. banquet hall, 15,000 sq. ft. of meeting space and support areas including a commercial kitchen. |
|
|
|
|
|
Hospital / Health Care
|
| |
| PROJECT NAME |
Independence Regional Hospital |
| CONTRACT AMOUNT |
$4,950,000 |
| START/END DATE |
2005 - 2007 |
| OWNER |
HCA |
| ARCHITECT |
Earl Swensson Associates Inc. |
| ENGINEER |
I. C. Thomasson Associates Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
Stowers Institute for Medical Research - Bldg. 1 |
| CONTRACT AMOUNT |
$4,800,000 |
| START/END DATE |
2002 - 2004 |
| ARCHITECT |
PGAV Architects |
| ENGINEER |
Gayner Engineers |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
Stowers Institute for Medical Research - Bldg. 3 |
| CONTRACT AMOUNT |
$9,200,000 |
| START/END DATE |
2002 - 2004 |
| ARCHITECT |
PGAV Architects |
| ENGINEER |
Gayner Engineers |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
Cameron Medical Center |
| CONTRACT AMOUNT |
$400,000 |
| START/END DATE |
2001 - 2002 |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| The new $11 million hospital is a 60,800 square foot, one-story, 58-bed facility with technologically-advanced equipment and new furnishings. Cameron Regional has 33 medical/surgical beds, six inpatient rehabilitation beds, five ICU cubicles, six ER treatment bays, and ten GeroPsychiatric beds. |
|
|
|
| PROJECT NAME |
Truman Medical Center - Lakewood ER Expansion |
| CONTRACT AMOUNT |
$1,200,000 |
| START/END DATE |
2005 - 2006 |
| OWNER |
Truman Medical Center |
| ARCHITECT |
ACI Boland |
| ENGINEER |
Bredson Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| Addition of a three story wing for Emergency Rooms, Isolation Rooms, and other medical areas. |
|
|
|
| PROJECT NAME |
Lee's Summit Hospital |
| CONTRACT AMOUNT |
$1,800,000 |
| START/END DATE |
2006 - 2007 |
| OWNER |
HCA |
| ARCHITECT |
Perkins+Will |
| ENGINEER |
CCRD Partners Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
Research Hospital |
| CONTRACT AMOUNT |
$309,500 |
| START/END DATE |
2005 - 2007 |
| OWNER |
HCA |
| ENGINEER |
PSP |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
Remodel |
| SUMMARY |
|
|
|
| PROJECT NAME |
St. Luke's Wornall Campus - MAHI Tower / Women's Center |
| CONTRACT AMOUNT |
$6,000,000 |
| START/END DATE |
2008 (forthcoming) |
| ARCHITECT |
ACI Boland |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
St. Luke's Lee's Summit - Hospital Expansion (Bldg."A") |
| CONTRACT AMOUNT |
$1,600,000 |
| START/END DATE |
2008 - |
| ARCHITECT |
ACI Boland |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
St. Luke's Lee's Summit - Cardiovascular Consultants (Bldg."C") |
| CONTRACT AMOUNT |
$170,000 |
| START/END DATE |
2008 - |
| ARCHITECT |
ACI Boland |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
St. Luke's Lee's Summit - O.R. Expansion (Bldg."A") |
| CONTRACT AMOUNT |
$220,000 |
| START/END DATE |
2008 - |
| ARCHITECT |
ACI Boland |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
St. Luke's Lee's Summit - E. R. Addition (Bldg."B") |
| CONTRACT AMOUNT |
$40,000 |
| START/END DATE |
2008 - |
| ARCHITECT |
ACI Boland |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
St. Luke's South - 3rd Floor Expansion |
| CONTRACT AMOUNT |
$231,000 |
| START/END DATE |
2007 - 2008 |
| ARCHITECT |
ACI Boland |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
P1 Group |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
Bothwell Regional Medical Center Kitchen Expansion (Sedalia, MO) |
| CONTRACT AMOUNT |
$306,000 |
| START/END DATE |
2007 - 2008 |
| OWNER |
Bothwell RMC |
| ARCHITECT |
ACI Boland |
| ENGINEER |
Brack & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
Rand Construction Co. |
| BUILDING TYPE |
Remodel |
|
|
| PROJECT NAME |
Ellett Hospital (Appleton City, MO) |
| CONTRACT AMOUNT |
$306,000 |
| START/END DATE |
2007 - 2008 |
| ARCHITECT |
ACI Boland |
| ENGINEER |
Bredson & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
Foley Company |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
McCune Brooks Hospital (Carthage, MO) |
| CONTRACT AMOUNT |
$1,605,000 |
| START/END DATE |
2006 - 2008 |
| OWNER |
McCune Brooks Hospital |
| ARCHITECT |
HMN Architects |
| ENGINEER |
Brack & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
Foley Company |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
UMKC Health Services Bldg. |
| CONTRACT AMOUNT |
$1,610,000 |
| START/END DATE |
2005 - 2007 |
| OWNER |
The Curators of the University of Missouri |
| ARCHITECT |
Kallman, McKinell and Wood Architects |
| ENGINEER |
I.D.E.A. |
| GENERAL CONTRACTOR |
Walton Construction |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors, Inc. |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
KU Medical Center Heart Hospital |
| CONTRACT AMOUNT |
$2,310,000 |
| START/END DATE |
2006 - 2007 |
| OWNER |
University of Kansas Hospitals |
| ARCHITECT |
RTKL Associates |
| ENGINEER |
Smith, Seckman and Reid, Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
KU Westwood |
| CONTRACT AMOUNT |
$1,200,000 |
| START/END DATE |
2006 - 2007 |
| OWNER |
KU MED |
| ARCHITECT |
RTKL |
| ENGINEER |
Meinhardt Consulting Engineers |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
Remodel |
|
|
| PROJECT NAME |
Liberty Hospital - Medical Plaza East |
| CONTRACT AMOUNT |
$640,000 |
| START/END DATE |
2004 - 2005 |
| ARCHITECT |
Hoefer, Wysocki Architects |
| ENGINEER |
Henderson Engineers Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
JRH Biosciences |
| CONTRACT AMOUNT |
$492,100 |
| START/END DATE |
2004 - 2005 |
| GENERAL CONTRACTOR |
McCown Gordon Construction |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
North Kansas City Hospital - Health Services Pavilion |
| CONTRACT AMOUNT |
$2,150,000 |
| START/END DATE |
2003 - 2005 |
| ARCHITECT |
HMN Architects |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
St. Luke's Lee's Summit |
| CONTRACT AMOUNT |
$2,150,000 |
| START/END DATE |
2003 - 2005 |
| ARCHITECT |
HMN Architects |
| ENGINEER |
W. L. Cassell & Associates |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction / Remodel |
|
|
| PROJECT NAME |
Children's Mercy Hospital - Clinic & Research Bldg. |
| CONTRACT AMOUNT |
$1,405,000 |
| START/END DATE |
2002 - 2004 |
| ARCHITECT |
HMN Architects |
| ENGINEER |
Smith, Seckman and Reid, Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
Children's Mercy Hospital - Henson Tower |
| CONTRACT AMOUNT |
$630,000 |
| START/END DATE |
2001 - 2003 |
| ARCHITECT |
HMN Architects |
| ENGINEER |
Smith, Seckman and Reid, Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
Cathedral Square / KC Southern |
| CONTRACT AMOUNT |
$378,000 |
| START/END DATE |
2000 - 2002 |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
W.L. Carrell Children's Hospital |
| CONTRACT AMOUNT |
$6,500,000 |
| OWNER |
Vanderbilt University |
| ENGINEER |
SSR, Inc. |
| GENERAL CONTRACTOR |
Centex-Rodgers Construction Company |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
Hospital |
| SUMMARY |
|
|
|
| PROJECT NAME |
Baptist Health Memorial Medical Center North Little Rock, Arkansas |
| START/END DATE |
2000 - 2002 |
| GENERAL CONTRACTOR |
Baldwin Shell Construction Co. |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
|
|
|
|
Hotel / Casinos
|
| |
| PROJECT NAME |
Hilton Americas - Hotel & Convention Center - Houston, TX |
| CONTRACT AMOUNT |
$7,900,000 |
| OWNER |
Hilton Hotels |
| ENGINEER |
I.A. Namant Associates Inc. |
| GENERAL CONTRACTOR |
Turner Construction Co. |
| MECHANICAL CONTRACTOR |
MLN Mechanical Contractors |
| BUILDING TYPE |
Hotel and Convention Center |
| SUMMARY |
|
|
|
| PROJECT NAME |
Kirkwood Circle |
| CONTRACT AMOUNT |
$800,000 |
| START/END DATE |
2003 - 2005 |
| OWNER |
DST Realty, Inc |
| ARCHITECT |
Nagle Hartray Danker Kagan McKay Penney Architects Ltd. |
| ENGINEER |
ME Engineers |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| 69-unit luxury condominiums. The ground floor plan includes the lobby, fitness center, and building office plus 3 housing units and an outdoor lap pool/whirlpool for residents. Unit types and sizes vary, from 1,160 - 2,070 s.f. on the 2nd through 9th floors, culminating in 2, underground parking garage accommodates 176 cars. |
|
|
|
| PROJECT NAME |
Harrah's Pavilion Expansion |
| CONTRACT AMOUNT |
$1,400,000 |
| START/END DATE |
2005 - 2006 |
| OWNER |
Harrah's Entertainment Group |
| ARCHITECT |
Paul Steelman Design Group |
| ENGINEER |
GSA Consulting Engineers. |
| GENERAL CONTRACTOR |
Walton Construction |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
Remodel and renovation |
| SUMMARY |
| Addition of restaurants such as Toby Keith's I Love This Bar, Moby's Fish Tales, and The Range Stakehouse as well as the addition of a two story mulit-purpose lounge / night club. |
|
|
|
| PROJECT NAME |
Harrah's North Kansas City Hotel |
| CONTRACT AMOUNT |
$650,000 |
| START/END DATE |
2004 - 2005 |
| OWNER |
Harrah's Entertainment Group |
| ARCHITECT |
Paul Steelman Design Group |
| ENGINEER |
Giovanetti Shulman Associates |
| GENERAL CONTRACTOR |
Walton Construction |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
Kansas City Station Casino - Vessels 1 & 2 |
| START/END DATE |
1996 |
| OWNER |
Station Casinos |
| ARCHITECT |
Peckham, Guyton, Albers & Viets |
| ENGINEER |
AE Associates, Inc. |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
|
|
|
|
Commercial Buildings
|
| |
| PROJECT NAME |
H&R Block World Headquarters |
| CONTRACT AMOUNT |
$4,500,000 |
| START/END DATE |
2005 - 2006 |
| OWNER |
H&R Block |
| ARCHITECT |
CDFM2 |
| ENGINEER |
M.E. Engineers |
| GENERAL CONTRACTOR |
Hines / JE Dunn |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| The 585,000-square-foot office building will house up to 2,000 general office work spaces, a 10,000-square-foot data center, a 300-seat theater that will be jointly used by the Kansas City Repertory Theater, a full-service employee café, and a five-level, 2,000-space below-grade parking structure. |
|
|
|
| PROJECT NAME |
Union Pacific Headquarters Building |
| CONTRACT AMOUNT |
$4,500,000 |
| OWNER |
Union Pacific Railroad |
| ENGINEER |
Alvine and Associates Inc. |
| GENERAL CONTRACTOR |
Holder Construction Co. |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
Office Building |
| SUMMARY |
|
|
|
| PROJECT NAME |
2525 West End Avenue |
| CONTRACT AMOUNT |
$940,000 |
| OWNER |
Vanderbilt University |
| ARCHITECT |
Skidmore, Owings and Merrill LLP |
| ENGINEER |
SSR, Inc. |
| GENERAL CONTRACTOR |
Brasfield and Gorrie LLC |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
Office Building |
| SUMMARY |
|
|
|
| PROJECT NAME |
Midwest Mechanical Contractors - Kansas City |
| CONTRACT AMOUNT |
$83,000 |
| START/END DATE |
2006 |
| OWNER |
Midwest Mechanical Contractors |
| ARCHITECT |
Davidson Design Group |
| ENGINEER |
BC Engineers |
| GENERAL CONTRACTOR |
Meyer Brothers Building Company |
| MECHANICAL CONTRACTOR |
Midwest Mechanical Contractors |
| BUILDING TYPE |
New Construction |
| SUMMARY |
| The relocation of Midwest's Kansas City headquarters to Kansas City, MO. |
|
|
|
| PROJECT NAME |
Cabela's |
| CONTRACT AMOUNT |
$720,000 |
| START/END DATE |
2001 - 2002 |
| OWNER |
Cabela's |
| ARCHITECT |
KKE Architects |
| GENERAL CONTRACTOR |
Kraus Anderson |
| MECHANICAL CONTRACTOR |
AD Jacobson |
| BUILDING TYPE |
New Construction |
| SUMMARY |
|
|
|
| PROJECT NAME |
Applebee's Support Center |
| CONTRACT AMOUNT |
$1,155,000 |
| START/END DATE |
2007 - 2008 |
| OWNER |
Applebee's / IHOP |
| ARCHITECT |
Berkebile, Nelson, Immenschuh, McDowell Inc. |
| ENGINEER |
Lankford & Associates Consulting Engineers, Inc. |
| GENERAL CONTRACTOR |
JE Dunn |
| MECHANICAL CONTRACTOR |
US Engineering Co. |
| BUILDING TYPE |
New Construction |
|
|
| PROJECT NAME |
American Century Services 4400 |
| CONTRACT AMOUNT |
$174,000 |
| START/END DATE |
2006 - 2007 |
| OWNER |
American Century Services |
| ARCHITECT |
360 |
| ENGINEER |
Smith & Boucher |
| BUILDING TYPE |
Remodel |
| SUMMARY |
| Auditorium and Office Remodel |
|
|
|
| PROJECT NAME |
American Century Services / Summit Tech Campus |
| CONTRACT AMOUNT |
$341,500 |
| START/END DATE |
2006 - 2007 |
| OWNER |
American Century Services |
| ARCHITECT |
360 |
| ENGINEER |
Smith & Boucher |
| BUILDING TYPE |
Remodel |
| SUMMARY |
| |